Current Projects

Curran & Briggs Limited is able to carry out a diversified selection of work.  Displayed below are some of the projects that we have taken on this season.  Where photos or a link is displayed click on the photo / link, click on your browsers back button to return to this page. 

 

bullet Cavendish Farms  Plant 1:  Contracted by JDI this project will see a portion of the existing loading area milled and repaved as part of the company's on-going pavement maintenance program.

 

bullet Green Diamond Sitework:  This project for Lindsay Construction has C&B doing site work to include; clearing & grubbing, electrical trenching and installing bollards, laying storm sewer & driveway culverts, asphalt work, well and septic systems with any required landscaping carried out to complete the project.

 

bullet Tignish / Rte 153:  Contracted by The Department of Transportation, Infrastructure & Energy this project will see the existing road milled and repaved as part of the provinces on-going pavement maintenance program.

 

bullet St Edward / Rte 152:  Contracted by The Department of Transportation, Infrastructure & Energy this project will see the existing road milled and repaved as part of the provinces on-going pavement maintenance program.

 

bullet Three Oaks Senior High:  Contracted by The Department of Transportation, Infrastructure & Energy this project will see C&B carry out electrical & propane trenching, install new catch basins, concrete curbing & sidewalks and asphalt paving as required.

C&B TOSH

 

bullet Oceanview Resort Phase 1:  This project for PEI Oceanview Resort Inc has C&B doing site work to include; clearing & grubbing, electrical trenching and installing light bases, removing an old lift station and installing a new one, laying storm water lines, catch basins, sewer main, manholes and water services with any required landscaping carried out to complete the project.

C&B Oceanview Resort

 

bullet Travellers Rest Traffic Circle:  Contracted by The Department of Transportation,  Infrastructure & Energy this project will see the current round about and ramps milled and resurfaced, also some concrete repairs will be carried out.

 

bullet Stanley Bridge / Rte 6:  Contracted by The Department of Transportation, Infrastructure & Energy this project will see the existing asphalt deck removed from the bridge the deck surface cleaned, primed and a protective membrane applied then the deck surface recovered with asphalt.

                                 C&B Stanley Bridge   C&B Stanley Bridge 2  C&B Stanley Bridge 3

 

bullet Wellington / Rte 124:  Contracted by The Department of Transportation, Infrastructure & Energy this project will see the existing road milled and repaved as part of the provinces on-going pavement maintenance program.

C&B Wellington

 

bullet MacKenzie Drive:  This project for the City of Summerside has C&B laying storm water lines, catch basins, sewer main and manholes and water services including hydrants in addition sections of the road in the work area paved, concrete curbs and gutters added where required and landscaping carried out to complete the project. 

C&B MacKenzie Drive

 

bullet Bloomfield / Rte 2 Traffic Circle:  Contracted by The Department of Transportation,  Infrastructure & Energy this project will see the existing four way intersection replaced by a traffic circle.  Job specs call for the construction of the traffic circle, installing storm lines, catch basins, concrete curbing and landscaping as required to complete the project.

C&B Bloomfield Round About   C&B Bloomfield Round About 2

 

bullet Cavendish Campground Entrance Rehabilitation:  This project for Parks Canada will see C&B upgrading the entrance to Cavendish Campground.  Work will entail land clearing, excavation, site work, site services, earthworks, concrete & asphalt work as well as landscaping.

 